Halter Casagrande

Central and University Library
Lucerne, 2019

Central and University Library Central and University Library Central and University Library Central and University Library Central and University Library Central and University Library Central and University Library Central and University Library Central and University Library

The cross-section of the building is designed so that, on entering the premises, visitors sense the full impact of the building’s height. Daylight floods right through to the ground floor from skylights along the eastern elevation. The reading areas and workstations are located along these new galleries. A new additional stairway connects the ground floor with the basement level. A light channel along the western façade illuminates the workspaces and the special collection, creating a continuous open-plan space inside the remodelled building and interconnecting each of the storeys. The spacious design makes the open-hand library feel bright and friendly, in keeping with the modern postulate of sun, light and air.

Project Lussi+Halter Architekten
Building costs CHF 18 Mio.
Commission Study, 1st place
Year 2007 – 2019
Building owner Kanton Luzern
Cooperation

Caretta + Weidmann Baumanagement, Zürich

Assistance

Bruno von Flue

Janine Koch

Stefan Heiniger

Hugo Dias

Anna Grabowska

Construction Engineer Bernhard Trachsel
Electrical Engineer Jules Häfliger AG
HVAC Engineer Peter Berchtold
Structural physics Ragonesi Strobel & Partner AG
Lighting Design d-lite lichtdesign
Award

Obstacle-Free Architecture Department - Winner

Arc-Award 20/21 - Winner Category Transformation: Renovations, Conversions

Publication

wohnrevue

architektur Zentralschweiz 2021/2022

Das Magazin der Schweizer Baudokumentation

Schweizer Baudokumentation

BlickPunkt

werk, bauen + wohnen

TEC21

Lucerne Central and University Library Heritage Renovation

Hochparterre

Kulturmagazin 041