Halter Casagrande

School Dreilinden Propsteimatte
Lucerne, 2005

School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte School Dreilinden Propsteimatte

The court buildings in Lucerne have been further extended through the construction of another self-contained building on Kapuzinerweg, designed in the style of the court church, priory or seminary. The exposed concrete surfaces are composed of overhanging, smooth, relief-like concrete elements modelled in the style of the dry-stone walls on the court church. The hillside relief is marked by terraces with meter-high walls and hedges in front.

Project Lussi+Halter Architekten
Building costs CHF 18 Mio.
Commission Competition, 1st place
Year 2003 – 2005
Building owner KV Luzern
Cooperation

Christoph Weibel, Buchrain

Assistance

Brigitte Bossardt

Astrid Kartmann

Fabian Kaufman

Landscape architecture Robert Gissinger
Award

Award of good building culture Lucerne 2005 - 2016

Publication

Hotbook

werk, bauen + wohnen

Braun - Schools

Architekturführer Kanton Luzern

Hochparterre

Karton

Photography essay Dreilinden School Propsteinmatte

Architektur & Technik

Opus C