Halter Casagrande

High school building
Horw, 2017

High school building High school building High school building High school building High school building High school building High school building High school building High school building High school building High school building

The existing secondary school building from the 1970s requires a complete renovation. The structure, made of steel, is flexible and remains well suited for the new spatial requirements. Furthermore, the building is being expanded on the south side to accommodate new school services. Along these lines, the entrance lobby will be spatially refined and improved. The atrium will be covered and, with a generously sized staircase, is being converted into the school's central gathering point. The rainscreen cladding is undergoing a fundamental redesign as a 2-layer glass construction (CCF facade). The rhythmic interplay of the coloured glass elements gives the new secondary school building in Horw a distinctive, unique appearance

Project Lussi+Halter Architekten
Building costs CHF 30 Mio.
Commission Competition, 1st place
Year 2013 – 2017
Building owner Gemeinde Horw
Cooperation

ARGE Lussi+Halter, Luzern

Assistance

Harri Verhofnik

Alexander Seidel

Ina Mergen

Marco Thürig

Andreas Ambühl

Abel Basurto

Site management a4 Architekten
Construction Engineer BlessHess AG
Façade engineering GKP Fassadentechnik
Electrical Engineer Elektroplan Buchs & Grossen
HVAC Engineer Imboden Solista
Landscape architecture Koepfli Partner GmbH
Lighting design Priska Meier Lichtkonzepte
Structural physics Ragonesi & Strobel Partner